The Potain MDT 139 tower cranes are equipped with a crane control system that provides the highest levels of convenience, ergonomics and lifting capacity. With CCS, the crane can be commissioned on site in less than 15 minutes. Adjustment of limit switches, load limiters and load torque is carried out on the screen in the cab, which increases productivity and speeds up the crane commissioning.
Maximum lifting capacity | 6 t |
Max. radius | 55 m |
Lifting capacity at boom end | 1.9 t |
Hook lifting height | 51.7 m |