The design of the hydraulic fracturing station of the GRP / S type is a basic version, supplemented by a gas meter, with a throughput of up to 6 m3 / h. The control and distribution point is fully assembled in a steel cabinet. Connection to the control cabinet is carried out on the underside of the cabinet using ¾ “couplings, conical pipe (R) or cylindrical (G) thread.